University of Connecticut

Events Calendar

Calendars Today
Sun, Aug 8 2021Mon, Aug 9 2021Tue, Aug 10 2021Wed, Aug 11 2021Thu, Aug 12 2021Fri, Aug 13 2021Sat, Aug 14 2021
  1. All Day
    1. Cabling and Equipment Upgrade for Hale/Ellsworth Res Halls
    2. Convert MSB Commvault Backup Pool to XFS
    3. East Campus Redidence Hall Network Upgrades
    4. IBM block storage upgrade to 8.4.0.3
    5. Install 30 new disks in IBM MSB Flash System 7200
    6. Migrate VLAN 169 & 170 to New Firewall
    7. Replace failed hard drive in the Citrix ADC in HBL
    8. Setting up exa01 for encryption
  1. 8am
    1. AssetWorks Monthly Maintenance
    2. Reboot the NetApp Nodes prior to the ONTAP OS Upgrade
  1. All Day
    1. Cabling and Equipment Upgrade for Hale/Ellsworth Res Halls
    2. East Campus Redidence Hall Network Upgrades
    3. IBM block storage upgrade to 8.4.0.3
    4. Install 30 new disks in IBM MSB Flash System 7200
    5. Migrate VLAN 169 & 170 to New Firewall
    6. Replace failed hard drive in the Citrix ADC in HBL
    7. Setting up exa01 for encryption
  1. 12:40pm
    1. Aurora Plugin Update
  1. 2pm
    1. Convert RHEL7 servers Authentication to AD from Kerberos
  1. 3:45pm
    1. Disable "Full Multiple Company Support" in Track-IT as a work around for ISD-81994
  1. 4pm
    1. IT1292 - 60 cable and Fiber BB6 repair (300050)
  1. All Day
    1. Cabling and Equipment Upgrade for Hale/Ellsworth Res Halls
    2. East Campus Redidence Hall Network Upgrades
    3. IBM block storage upgrade to 8.4.0.3
    4. Install 30 new disks in IBM MSB Flash System 7200
    5. IT1292 - 60 cable and Fiber BB6 repair (300050)
    6. Migrate VLAN 169 & 170 to New Firewall
    7. Replace failed hard drive in the Citrix ADC in HBL
    8. Setting up exa01 for encryption
  1. 10am
    1. bamboo prod upgrade
  1. 2pm
    1. Emergency Change for Reports of Enrollment Errors
  1. 5pm
    1. Update AnyWare Citrix
  1. All Day
    1. Cabling and Equipment Upgrade for Hale/Ellsworth Res Halls
    2. East Campus Redidence Hall Network Upgrades
    3. IBM block storage upgrade to 8.4.0.3
    4. Install 30 new disks in IBM MSB Flash System 7200
    5. IT1292 - 60 cable and Fiber BB6 repair (300050)
    6. Migrate VLAN 169 & 170 to New Firewall
    7. Setting up exa01 for encryption
  1. 12am
    1. Replace failed hard drive in the Citrix ADC in HBL
  1. 5:30am
    1. Weekly Linux Patch Servers
    2. Windows Weekly Patch Servers
  1. 8am
    1. Convert GDC Commvault Backup Pool to XFS
  1. All Day
    1. Cabling and Equipment Upgrade for Hale/Ellsworth Res Halls
    2. Convert GDC Commvault Backup Pool to XFS
    3. East Campus Redidence Hall Network Upgrades
    4. IBM block storage upgrade to 8.4.0.3
    5. Install 30 new disks in IBM MSB Flash System 7200
    6. Migrate VLAN 169 & 170 to New Firewall
    7. Setting up exa01 for encryption
  1. 12am
    1. IT1292 - 60 cable and Fiber BB6 repair (300050)
  1. 11:53am
    1. Releasing new location/personas to myUConn
  1. 1:30pm
    1. Allow Commvault Backup of Virtual WFS Cluster
  1. 5pm
    1. JAMF Upgrade
  1. All Day
    1. Convert GDC Commvault Backup Pool to XFS
    2. East Campus Redidence Hall Network Upgrades
    3. IBM block storage upgrade to 8.4.0.3
    4. Migrate VLAN 169 & 170 to New Firewall
    5. Setting up exa01 for encryption
  1. 12am
    1. Cabling and Equipment Upgrade for Hale/Ellsworth Res Halls
  1. All Day
    1. Convert GDC Commvault Backup Pool to XFS
    2. East Campus Redidence Hall Network Upgrades
    3. IBM block storage upgrade to 8.4.0.3
    4. Migrate VLAN 169 & 170 to New Firewall
    5. Setting up exa01 for encryption
Control Panel